SOUTHSIDE WASTEWATER TREATMENT PLANT PEAK FLOW
BASIN NO. 4 EXPANSION AND SITE IMPROVEMENTS, CONTRACT NO. 18-012
Dallas
Water Utilities, 320 E. Jefferson Blvd., Rm. 215, Dallas, TX, 75203.
There
will be a Pre-Bid Conference held at 9:00 am on Thursday, October 19, 2017 at the Southside
Wastewater Treatment Plant, Administration Building, 4th floor, located at
10011 Log Cabin Road, Dallas, TX 75253, AND
9:00 am on Tuesday, October 24,
2017 at the Southside Wastewater Treatment Plant, Administration
Building, 4th floor, located at 10011 Log Cabin Road, Dallas, TX 75253. There
will be a Pre-Bid Site Visit following the Pre-Bid Conference at the Southside
Wastewater Treatment Plant.
Plans
& Specifications cost $50.00 for Full-Size Set, $40.00 for Half-Size Set,
or $5.00 for Plans & Specs on CD, Non-Refundable; Available Friday, October
13, 2017 at Dallas Water Utilities, 320 E. Jefferson Blvd., Rm. 215, Dallas,
TX, 75203. Electronic version of Plans and Specifications can be obtained at
the following City of Dallas ftp web site from an Internet Explorer ftp://ftp.dallascityhall.com. IF YOU DOWNLOAD SPECS, PLANS, AND PROPOSALS
FROM ftp://ftp.dallascityhall.com,
PLEASE CALL 214-948-4584 SO YOU CAN BE PLACED ON THE PLAN HOLDERS LIST AND BE
NOTIFIED OF ANY ADDENDA.
Project
Manager: Leslie Castillo; 214-948-4517
Bid Due Date: Friday, November 03, 2017
Bid Opening Date: Friday,
November 03, 2017