Abrams Road And Skillman Street
Corridor Studies

DCH Body

Page Content
​The City of Dallas Department of Transportation and Public Works is conducting corridor studies for Abrams Road and Skillman Street.  These two studies are being done independently, however the impacts of the two studies greatly influence the following corridors: 

  • Abrams Road between Richmond Avenue to Northwest Highway.
  • Skillman Street between Live Oak Street to Abrams Road. 

The studies began in Fall 2023 and will take about one year to complete.

Project Scope

These studies have three main phases:
(1) assess existing conditions; 
(2) analyze alternative designs for the corridor; and 
(3) finalize recommended transportation improvements. 

Previous Public Meetings/Survey

An online survey was open to the public from May 3 to May 30, 2024. This round of public engagement's objective was to provide the public with an opportunity to comment on existing issues and opportunities along the Abrams Road and Skillman Street corridors. Subsequent rounds of engagement will ask the public about recommended improvements for the corridors. The results of the May 2024 survey are available at the link below.

  • May 2024 Survey Results
​Provide Input

Public meeting:
TPW has hosted two public meetings about the transportation safety studies for the Abrams Road and Skillman Street corridors.

The second meeting involved updated recommendations that accounted for initial resident input. The meeting was conducted on Nov. 7, 2024, at the Lakewood Branch Library, 6121 Worth St., in Dallas.

Presentations:
View the Nov. 7, 2024, Abrams Road presentation

View the Nov. 7, 2024, Skillman Street presentation


Surveys
Public comment for the latest round of community engagement was accepted through Jan. 10, 2025.