MainTitleHeader
​​​Engineering/Surveying
Forms, Manuals, Procedures and Checklists

DCH Body
The Engineering Division is responsible for reviewing subdivision plats and private development engineering plans, and overseeing the construction to ensure that the City's infrastructure is built to City Code and adheres to approved plans and contract documents.

Oak Cliff Municipal Center
320 E. Jefferson Blvd. Room 200
Dallas, Texas 75203
Page Content

​For questions, please contact a project coordinator at 
(214) 948-4205 - Paving Drainage​
(214) 948-4607​ - Water/Wastewater​
Need a consultation, visit our Consultation page ​to schedule a time.​
Please Note: ​Office of Environmental Quality ​is now the responsible department for the Municipal Settings Designation.


Electronic Plan Review System via DallasNow. (Engineering Related Submittal Only):
DallasNow Submittal P​​ortal​
Drawing Filename Format

General Forms and Procedures:
Permitting Work Flow

Title Block:
Engineering Division Title Block (PDF) 
Engineering Division Title Block (DWG) 
Engineering Division Title Block (DGN) 

General Manuals:
North Centra​l Texas Standard Specifications Addendum 
Pavement Cut and Repair Standards Manual

​Paving/Drainage Engineering

Manuals:
The 2019 City of Dallas Street and Drainage Design Manuals and Street Process Manual are all in effect for projects with preliminary plats that were approved by City Plan Commission on or after October 1, 2019. If the infrastructure construction is not included in a city-approved private development contract within two years from the preliminary plat approval date, then the infrastructure must be redesigned using the most current criteria.

2019 Drainage Design Manual                                                                                                            
2019 Drainage Design Manual FAQ's
2019 Street Process Manual 
Complete Streets Design Manual 
USACE Criteria For Construction within Fed. Flood Limits (Pamphlet 1150-2-1) July 20​23 ver.
Off-Street Parking and Driveways Handbook
2021 ​​Traffic Sign Standards                                                                                   ​  ​                                                                                                               

1993 Drainage Design Manual                  ​                                                                                                                                                             
1998 Paving Design Manual


Forms, Procedures, and Checklists:
Plan Review Submittal Procedures and Checklists (.pdf) - see 6A below
Traffic Engineering Review Checklist (.xlsx)
Drainage Report Template (.doc) 
Drainage Report Template (.pdf)​​
Covenant Agreement - P/D
Trip Generation Worksheet (.pdf)
Trip Generation Worksheet (.xl)
Development Impact Review (DIR) Form 
Indented Parking Form
Parklet Review Form
School Traffic Management Plan (TMP) Guidelines 
Escarpment Application and Or​dinance

Private Development Contracts
Inspection Certification (Sample Letter)


Dallas Code Sec.51A-8.601(b)

  • 1. The Thoroughfare Plan for the City of Dallas with the latest amendments. (June 1993)
  • 2. The CBD Streets Vehicular Circulation Plan with the latest amendments
  • 3. The Long-Range Ph​ysical Plan for Parks and Recreational Facilities. (August 2002)
  • 4. The Street Design Manual of the city of Dallas. (September 2019)
  • 5. The Drainage Design Manual of the City of Dallas
  • 6.a Drainage Paving Engineering Review Checklists (Sept. 2026)
  • 6.b Traffic Engineering Review Checklist Rev (Sept. 2026)
  • 7. The Standard Construction Details of the Dep​artment of Public Works (Sept. 2026)
  • 8. The Texas Uniform Traffic Control Device Manual (Sept. 2026)
  • 9. The most recently adopted Dallas Bike Plan. (June 2011)


​Survey Review Group ​

​Forms, Procedures and Checklists

Designated Noise Level (DNL) General Note Sample
Dedication - Corporate
Dedication - Municipal
Dedication - Private Street
Dedication - Private Owner
Dedication - Shared Access Area
Detention Area Easement Statement
Field Note Separate Instrument Checklist
Final Plat Review Checklist
Floodway Easement (within a common area) - Statement D
Floodway Easement - Statement C
Platting Memo of Understanding 
Notwithstanding Statements
Shared Access Area Easement - Statement
Tree Preservation Zone Statement


​Water/Wastewater Engineering​​

Manuals
DWU - Design and Construction Standards
Development Design Procedure and Policy Manual
Trench Repairs Ordinance 26263

Forms, Procedures, and Checklists

Pre-Submittal Phase

  • Private Development Contract (P-Contract) Criteria
  • Water/Wastewater Availability Request Form - 
  • Utility Coordination Letters
  • Water/Wastewater Easement Requirements 
  • Covenant Agreement - W/WW ​
  • Water/Wastewater Availability Request Form
  • Fire Coordination Certificate​ 

Submittal Phase
  • Water/Wastewater Engineering Design Checklist
  • Application for Review of Water & Wastewater Design Plans
  • Building Permit Review - W/WW Service Checklist (Permit Only Review)
  • Supplemental Review Check List (Restaurants & Service Stations)
  • Shared Access Development Checklist for Water & Wastewater
  • General Notes - Private Development
  • Sample Backflow Request Page
  • Septic Tank Request  


Post-Design Phase 
  • DWU Water and Wastewater Customer Fee Table (Effective 2016)
  • DWU Construction Staking Cut Sheet
  • Permit to Discharge to the Sanitary Sewer  (PALS)
  • Water and Wastewater P Contract
  • Water and Wastewater P Contract - Sample
  • Request for Inspector East of I-30/DNT (W/WW Only)
  • Request for Inspector West of I-30/DNT (W/WW Only)

 

 

View Planning & Development Full List of Forms​ 





Title