The following design and survey resource files are to be used in design of water/wastewater mains owned and operated by DWU. All documents below are in MS Word format unless noted otherwise.
Appendix A- Preliminary Design Report Checklist.doc (72 KB)
Appendix B- Subsurface Utility Engineering (SUE) Quality Level B Requirements- October, 2013.doc (80 KB)
Appendix C- Subsurface Utility Engineering (SUE) Quality Level A Requirements- October, 2013.doc (89 KB)
Appendix D- Topographic Survey Requirements- October, 2013.doc (284 KB)
Appendix E- Boundary Survey Requirements- October, 2013.pdf (Adobe Acrobat, 5.27 MB)
Appendix F- General Notes for CIP Projects- October, 2013.doc(243 KB)
Appendix G- General Notes for Joint Contracts- October, 2013.doc (2.51 MB)
Appendix H- Final Plan Review- October, 2013.doc 274 KB)
Appendix I- Final Plan Review Checklist- October, 2013.doc (308 KB)